TRANSMISSION LINE TOWERS:

For ALSTOM

  • 132 kV Transmission Line Foundation design at DHA Rahber.
  • 132 kV Transmission Line Foundation design at Central Park.
  • 132 kV Transmission Line Foundation design at Jublee Town.

Alpine Enterprises.

  • Transmission Line Foundation Design for Dasu Hydropower Project.

For POTENTIAL ENGINEERS (Pvt.) Ltd.

  • Transmission Line Foundation Design at FESCO.

For M/s Energy and Engineering Projects (Pvt.) Ltd.

  • 380 KV D/C Over Head Transmission Line Foundation Design from HUNAYN to MASHAER at Saudi Arabia. Foundation design included types for normal, angle, special and dead end towers.

For ATLANTIC COORPORATION:

  • Afghan National Security Forces (ANSF) North Electrical Interconnect Camp Shaheen Balh Province Afghanistan. 20 kV Transmission Line from Garrison to Camp Shaheen section & Camp Shaheen to Dashti Shadian section. Work included preparation of transmission line route plan and profile on PLSCADD, foundation design and Lattic Tower structural design on PLS-TOWER.

OTHER TRANSMISSION LINE WORKS:

  • Prepare  Route  Alignment,  Plan  &  Profile  and  Construction  of  220Kv  Double  Circuit  Twin  bundle  Transmission Lines Duber Khawar, Khan Khawar & Allahi Khawar on Tributaries of River Indus (Lot  I) (NEIE / Netracon Technology) Pakistan
  • Prepare Structural Design & Drawings of 110 KV Chimtala Substation. (DABS) Afghanistan. 
  • Prepare Structural Design & Drawings of 110 KV Kabul North Substation. (DABS) Afghanistan.
  • Prepare Structural Design & Drawings of 220KV AIS Ludewala Substation. (Sargodha) Pakistan  
  • Foundation  Design,  Drawings  &  Bar  bending  Schedule  of  500kv  Single  Circuit  Transmission  Line  Guddu‐Multan 1st Circuit. (CCPG China) Pakistan 
  • Structural Design & Drawings  of  100 mw  power  plant at Quaid‐e‐Azam  solar  park.  (Bahawalpur)  Pakistan. 
  • Plan & Profile of 17MW Ronalia Hydro Power Project. Interconnection of 220kv Transmission Line.  (Ranolia) Pakistan
  • Prepare Plan & Profile of 220kV KunduzTaloqan Transmission Line. (DABS and KEC India) 
  • Prepare Plan & Profile of 110kV Transmission Line  fron Naglu  to Tapa Ahmad Beg Substation and  Substation 110/20kV in Tapa Ahmad Beg, Tabag District. (Kipisa Province) Afghanistan
  • Prepare  Plan  &  Profile  of  220kv  Gardiz  to  Khost  Transmission  Line  NEPS  electrical  transmission  projects. (DABS) Afghanistan
  •  Prepare Design of Gardez and Wazai Zadran (lot‐2) distribution networks foundation design report. (DABS) Afghanistan
  • Prepare  Plan  &  Profile  along  with  structures  design,  drawings  of  Camp  Cammando  Power  Plant  Electrical Utility Study. (DABS) Afghanistan
  • Prepare  Plan  &  Profile  of  Mepco  132KV  Double  Circuit  Transmission  Line  from  Kot  Addu  Grid  Station to Kot ‐ Sultan ‐ Layyah Grid Station (Rail Conductor 60KM) (District Multan Pakistan). 
  • Prepare Route Alignment, Plan & Profile & Foundation Design of 110kv Double Circuit Transmission  Line Khorugh to Boni (40km). Tajikistan 
  • Prepare Plan & Profile of 132kv Double Circuit Transmission Line Battal to Jabori (District Mansehra  Pakistan). 
  • Prepare  Plan &  Profile &  Foundation  Design  of  132kv  single  circuit  transmission  line  from  132kv  Grid station 18 Hazari to 132kv Grid Station Garh Maharaja (District Faisalabad) Pakistan. 
  • Prepare Route Alignment, Plan & Profile & Foundation Design of 132kv Double circuit Transmission  line  from  132kv  Grid  station  Kulach  to  Existing  132Kv  single  circuit  Transmission  Line  Hathala  (District D.I Khan) Pakistan. 
  • Preparation  of  Plan  &  Profile  &  Foundation  Design  of  220kV  SDT  Twin  Bundle  Rail  Conductor  Transmission Line 110 kM from Uch to Sibbi. . 
  • Preparation  of  Plan  &  Profile  &  Foundation  Design  of  220kV  SDT  Twin  Bundle  Rail  Conductor  Transmission Line 110 kM from Uch to Sibbi.  
    • Project:  GolenGol Hydro Power Project Lot‐4 Package I & II   Procurement  /  Design,  Supply,  Erection,  Stringing,  Testing  &  Commissioning  of  132  kV  Transmission Line and Grid Stations.   Client:  Water and Power Development Authority (WAPDA)  Key Responsibilities/Main Duties Performed:  Prepare Route Alignment  Prepare plan & profile Drawings on Pls‐Cadd Software  Calculation of Stringing Charts on Pls‐Cadd Software  Design & Drawings of Tower Foundations  Bar bending Schedules of Tower Foundations   Contour detail of uneven legs  Calculation of Earth Cutting/Filling
  • Karachi Electric Supply Company Project. KESC / 2480 ‐ 04 A.  
  • Switch Yard, roads & Control House Building Drawings and civil construction under the supervision  of KESC and ABB Pakistan. 
  • Jinnah  Hydropower  TO  Marri  Grid  Transmission  Line  survey  and  civil  works  with  DONG  FONG electric company china. 
  • Prepare Plan & Profile of Kunduz‐Taloqan 220KV Transmission Line 
  • Afghanistan under the supervision of SMEC Australia and KEC India. 
  • Prepare Route Alignment of 500kv & 220kv Transmissions in & out
  • shikarpur Substation Sindh under the supervision of BARQAB Consulting Services.
  • Gujranwala Electric Power Company (GEPCO) eleven substations for rural distribution construction  project under the supervision of HYUNDAI Engineering Pakistan. 
  • 17MW Ronalia Hydro Power Project. Interconnection of 220kv Transmission Line.  (DESCON‐TRIED  consortium)  
  • Design, supply, installation of static var compensator at 220 kv new kotlakpat grid, lahore. (adb‐14‐ 2009) ABB pakistan. 
  • Site survey, preparing drawings and construction supervision complete project
  • GOLEN GOL HYDROPOWER PROJECT LOT‐4 PACKAGE‐I & II 
  • Procurement / Design, Supply, Erection, Stringing, Testing & Commissioning of   132 kV Line and Grid Stations.
  • Toyota City Motors Multan preparing the structural drawings and supervision. 
  • Gaddafi Stadium (For End Pavilion) at Lahore under the supervision of NESPAK. 
  • Pindi Stadium (For End Pavilion) at Rawalpindi under the supervision of NESPAK.
  • NAIB Building Islamabad. 
  • Kashmir Centre Jail Road Lahore. 
  • Trust Hospital Zarar Shaheed Road Lahore Cantt. Lahore. 
  • 110  KV  Chimtala  Substation  MEW  Afghanistan  under  the  supervision  of  SIEMENS  Engineering  Pakistan. 
  • 110  KV  Kabul North Substation MEW  Afghanistan  under  the  supervision  of SIEMENS Engineering  Pakistan. 
  • 220KV AIS Ludewala Substation Sargodha preparing the structural drawings and supervision under  the supervision of SIEMENS Engineering Pakistan. 
  • Foundation Structural Drawings of 500kv GUDDU‐MULTAN 1st Circuit with (CCPG China) under the  supervision of NESPAK. 
  • Prepared the drawings and Quantity calculations of 500 feet Guy Tower at RBS Badin   Sindh for Pakistan Television Corporation Limited. 
  • 100  mw  pv  power  plant  at  quaid‐e‐azam  solar  park  bahawalpur.  tbea  sun  oasis  pvt.  (ltd).  ilf  consulting engineers. 
  • Design  of  roshni  model  high  school  for  girls  (600  students)  shahaalam  colony,  tajpura  scheme,  lahore. 
  • Structural design of apartment building at plot # 68 block‐b‐2 Gulberg iii Lahore.